Privatized Infrastructure: The Build Operate Transfer Approach / edited by C Walker and A. J. Smith
Material type:
Item type | Current library | Home library | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
REFERENCE | Library, FOAP-AKTU | Library, FOAP-AKTU | Reference Book | Shelf 15.1-5 | R-692.5 WAL-P (Browse shelf (Opens below)) | 2018-19 | Not for loan | 011493 |
Browsing Library, FOAP-AKTU shelves, Shelving location: Shelf 15.1-5, Collection: Reference Book Close shelf browser (Hides shelf browser)
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
R-692.5 PAR-P Principles and Practice of Valuation / | R-692.5 PEU-E Estimating Construction Costs / | R-692.5 SAM-C CONSTRUCTION SCHEDULING, COST OPTIMIZATION AND MANAGEMENT / | R-692.5 WAL-P Privatized Infrastructure: | R-692.50 PET-C Construction Estimating Using Excel / | R-692.5094 DAV-S Spon's Architects and Builders Price Book 2021 / | R-692.5094 LAN-S Spon's European Construction Costs Handbook / |
There are no comments on this title.