Control of Engineering Projects: Engineering Management / edited by Stephen Wearne
Material type:
Item type | Current library | Home library | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
GENERAL BOOK | Library, FOAP-AKTU | Library, FOAP-AKTU | General Book | Shelf 30 | 690.24 WEA-C (Browse shelf (Opens below)) | Available | 015116 | ||
GENERAL BOOK | Library, FOAP-AKTU | Library, FOAP-AKTU | General Book | Shelf 30 | 690.24 WEA-C (Browse shelf (Opens below)) | 2019-20 | Available | 014835 |
The financial control of engineering projects depends on achieving time and cost criteria with the available manpower. The three variables of time, cost and manpower - in itself the work of many ....
There are no comments on this title.