Estimating Construction Costs / Robert L. Peurifoy, and garold D . Oberlender
Material type:
Item type | Current library | Home library | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
REFERENCE | Library, FOAP-AKTU | Library, FOAP-AKTU | Reference Book | Shelf 15.1-5 | R-692.5 PEU-E (Browse shelf (Opens below)) | 2016-17 | Not for loan | 008987 |
Browsing Library, FOAP-AKTU shelves, Shelving location: Shelf 15.1-5, Collection: Reference Book Close shelf browser (Hides shelf browser)
No cover image available No cover image available |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
R-692.5 NAM-V VALUATION IN COURT WITH COMMENTARY ON RULE 1BB... | R-692.5 OBR-P Preconstruction Estimating : Budget Through Bid / | R-692.5 PAR-P Principles and Practice of Valuation / | R-692.5 PEU-E Estimating Construction Costs / | R-692.5 SAM-C CONSTRUCTION SCHEDULING, COST OPTIMIZATION AND MANAGEMENT / | R-692.5 WAL-P Privatized Infrastructure: | R-692.50 PET-C Construction Estimating Using Excel / |
There are no comments on this title.